Utility Company’s Slow Response “Sparks” Concern

power-lines-electric-engineer-expert

Ronald J. Panunto, PE, CFEI, CVFI, CFC, CFPE, Electrical Engineer Consultant ::::
Case Synopsis: A 12-year old girl was badly injured when she inadvertently walked into a low-hanging, energized power line that had fallen from a distribution pole as a result of high winds from Hurricane Sandy. Plaintiff’s counsel retained an expert in order to determine liability on the part of the electric utility company for its poor response to repair the fallen power line.
Continue reading “Utility Company’s Slow Response “Sparks” Concern”